Showing comments and forms 1 to 1 of 1

Object

Part One: Spatial Strategy and Policies (Regulation 19)

Representation ID: 1188

Received: 28/11/2024

Respondent: Pegasus Grab Hire Ltd

Agent: Emery Planning

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

As drafted, the plan contradicts this policy and fails to protect existing waste facilities through the
allocation of sites within the plan, as our client’s site has not been allocated within the plan as an existing
or potential / future waste site, despite meeting a number of the criteria set out under paragraph 17.21
of the plan.

As per our previous representations, it remains the intention of our client to secure a permanent
consent to enable the continued operation of the site, they are currently in the process for preparing a
masterplan for the site and this will be shared with the LPA at the earliest opportunity, with the intention
of progressing pre-application discussions (which have already been initiated), early in 2025, the objective
of which is to secure a permanent consent for our client’s operations on an expanded site ahead of the
end date of the current temporary consent in 2026.